PFISR Deployment Update

PFISR Deployment Update

September 2006: Additional 64 panels installed, bringing the total to 96 (see photo).

Summer 2006: More panels integrated and tested at Menlo Park, prior to shipping to Alaska.

April 2006: Data from all deployed sites (Poker Flat, Alaska; Jicamarca, Peru; HAARP, Alaska) presented in numerous talks at Ionospheric Interactions Workshop in Santa Fe.

March 2006: Engineering tests conducted continuously for approximately 2-1/2 weeks, coordinated to occur during the world month run.

February 2006: Although system is not operational, engineering tests are conducted in a mode supporting an optical campaign for Dartmouth College.

January 2006: Installation of permanent power at ...